40,535 SF fast-track tenant improvement and was completed in 198 days.
32,000 SF of pharmacy lab area and five clean rooms.
Redundant power systems / UPS / generator and sweet water system.
Brown's Pharmaceutical Compounding
36,418 SF tenant build out.
893 Roof top mounted solar panels. Facility runs on Net Zero.
Dual 2 MIL BTU boilers, full building automation system. High efficiency McQuay RTU’s.
Dust control central vacuums, compressed air, deionized water, all under slab fed to 32 stations.
7,365 SF of ISO Class 7 & 8 sterile compounding labs.
29,014 SF laboratory and office.
Cardinal Health
Multiple construction projects in six states with a combine square footage of 64,260.
Radio pharmaceutical production facility.
Installation of Cyclotrons in concrete containment vault and clean room construction.
Full laboratory with hot cells, fume hoods and product containment systems.
MEP system include back-up electrical, UPS, and area isolation mechanical systems.
Radium colocation expansion, deep helical pier foundation system, and backup generators.
Medtronic Navigation Surgical Technologies Perfusion Systems - Parker, Colorado
102,000 SF tenant improvement and building addition.
The scope of work included a 60,000 SF pharmaceutical manufacturing area. 20,000 SF clean room, 15,000 SF refrigeration area, training and teleconference rooms.
Provident also completed 10,000 SF building addition.
Rocky Mountain Dental
First of several in the United States that offer training, teaching and traditional dental services
6,000 SF space with dual function training center and 6 dental surgery suites
VetweRx
4,680 SF Veterinary Hospital with boarding and grooming operation
Dental station, general laboratory, CAT scan, x-ray operation, and eight station operating rooms
Health One
4,000 SF Lower Denver (LoDo) location remodel
Fast track project with multiple emergency care and rehab facility
Medtronic Navigation Surgical Technologies Manufacturing Facility - Louisville, Colorado
112,000 SF state of the art medical technology facility.
Multiple tenant improvement projects including sales center, research laboratories, training and operating rooms, offices, lobby, labs, and break rooms.
State of the Art BMS and WFT Systems, clean rooms, refrigeration area, pharmaceutical manufacturing, training rooms, building additions.
Manufacturing production and shipping facilities, loading docks with associate exterior improvements.